Ensure power is disconnected to external garage for garage to be demolished.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 24-02-2016
Partner with Builderscrack
Get work