Kitchen rebuild starts Saturday July 8th so need work done prior! Oven getting relocated so needs to be disconnected prior to kitchen rebuild. Power switches and underfloor heating control panel need moving and replacing panel for the underfloor heating. (It’s old and discoloured) I’ve got another 2 underfloor heating control panels in bathrooms that need replacing at some stage depending on cost if I get it done at the same time.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very pleased with the job. Jandre came up with some great cost effective options that worked really well. Power cables covered so it looks tidy inside cupboards. Would definitely recommend and use again!
Work carried out by the owner/operator
Reviewed on 08-10-2023
Partner with Builderscrack
Get work