Run required cables for power and control to the bore and tank, install high level probs on the tank and low level probs for the bore. Wire up the bore pump and wire controls in new pump board to make all parts of the installation operate.
#1 | Tradie 1 |
|
69 jobs | No longer in contact |
#2 | Tradie 2 |
|
47 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 3 jobs | No longer in contact |
#4 | Tradie 4 | Not reviewed | 1 job | No longer in contact |
Partner with Builderscrack
Get work