Looking to get our new spa installed. Cable has been provided by previous electrician just needs to be hard wired in and connected to our mains board. Mains board is pretty full so might need a new board or some re-shuffling. Hoping to have this installed around Friday 16th July.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 31-07-2021