4 power point installations, mounting of 5 security cameras and power connection to distribution board (COC required) all parts / materials provided All materials provided.
#1 | Tradie 1 |
|
72 jobs | No longer in contact |
#2 | Tradie 2 |
|
14 jobs | No longer in contact |
#3 | Tradie 3 |
|
80 jobs | No longer in contact |
Partner with Builderscrack
Get work