Require connection to driveway Meter board (cable already run to location) for room and to connect existing cables to new switchboard in outside room. 6mm main cable run in conduit ready to be inspected.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Fully recommend, great job done.
Work carried out by the owner/operator
Reviewed on 06-04-2024
Partner with Builderscrack
Get work