External power point failure. Tripped fuse box. Burnt out plug.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
4.0
|
Communications |
4.0
|
Very satisfied, would not hesitate to use again.
Work carried out by the owner/operator
Reviewed on 18-10-2022
#1 | Tradie 1 |
|
77 jobs | Secured job |
#2 | Tradie 2 |
|
37 jobs | No longer in contact |
#3 | Tradie 3 |
|
65 jobs | No longer in contact |
Partner with Builderscrack
Get work