Review

Separating power meters

Job description

Switchboards
Rodney

Power feed required to be split onto two meters at the board. Current setup: Main power feed into main dwelling. Minor dwelling split off the main board with a measurement meter on the minor dwelling board. Future: 2 x meters on main house board with 2 ICPs for seperate billing. Will have future work in the minor dwelling once the renovations are underway. Thanks


Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo