Power feed required to be split onto two meters at the board. Current setup: Main power feed into main dwelling. Minor dwelling split off the main board with a measurement meter on the minor dwelling board. Future: 2 x meters on main house board with 2 ICPs for seperate billing. Will have future work in the minor dwelling once the renovations are underway. Thanks
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Easy to deal with. Turned up on time and did a good job. Would recommend.
Work carried out by the owner/operator
Reviewed on 13-07-2020
Tradesperson reply
"Thanks duane for your kind words"