New inside switchboard. All new light fittings. New power points to replace old ones. There are 3 cables that can be used, all the rest need to be replaced. Mains OK.
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 | No recent reviews | 19 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 46 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 11 jobs | No longer in contact |
#5 | Tradie 5 | Not reviewed | 0 jobs | No longer in contact |
#6 | Tradie 6 |
|
148 jobs | No longer in contact |
#7 | Tradie 7 | No recent reviews | 13 jobs | No longer in contact |
#8 | Tradie 8 | Not reviewed | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work