We're replacing a gas hot water cylinder with an electric and need power run from the switchboard, through the roof space (there is good access). The plumbing work is occurring on Monday 28 November, so ideally being able to have the connection completed that afternoon.
#1 | Tradie 1 |
|
85 jobs | No longer in contact |
#2 | Tradie 2 |
|
4 jobs | No longer in contact |
#3 | Tradie 3 |
|
48 jobs | No longer in contact |
#4 | Tradie 4 |
|
8 jobs | No longer in contact |
#5 | Tradie 5 |
|
18 jobs | No longer in contact |
Partner with Builderscrack
Get work