We started relining the rumpus in the garage and found the existing wiring needs looking at. 4 powerpoints to check and potentially rewire. 1 to be moved a metre. 3 lights to be rewired to switch together. Need one new datapoint too. All new faceplates PDL 600 series.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Tidy worker. Stuck to budget
Work carried out by the owner/operator
Reviewed on 22-03-2021
#1 | Tradie 1 |
|
30 jobs | Secured job |
#2 | Tradie 2 |
|
89 jobs | No longer in contact |
#3 | Tradie 3 |
|
267 jobs | No longer in contact |
Partner with Builderscrack
Get work