We are buying an old house and need to get the wiring certified before we can insure it. This needs to be done before Nov 1. Less urgent is we have a socket to repair and a new one to add. And also we need help with electrics for a basement conversion. This can be done later on.
#1 | Tradie 1 |
|
4 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 2 jobs | No longer in contact |
#3 | Tradie 3 |
|
4 jobs | No longer in contact |
Partner with Builderscrack
Get work