We are replacing a HWC (gas) to electric. I need an electrician to run a new cable to the hot water cylinder cupboard. The switch board and current wires are older. This work is being completed by plumber on the 8th June
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Lee made contact and explained what he was requiring to do really effectively, with a quote. I felt that he was confident in his work and was happy to hire him for a job! Thanks Lee
Work carried out by the owner/operator
Reviewed on 10-06-2021
Partner with Builderscrack
Get work