Published: 18 October 2021
Following a roof leak, all lighting circuity knocked out in upper storey. Step 1: Quotation for insurance purposes is required. Step 2: Quoted work to be carried out. The work to be done is in an old house.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Brilliant and thorough job resolving complex rewiring of century-old wiring. Dan is a great communicator who kept us apprised of the situation at each step. Contact with confidence.
Work carried out by the owner/operator
Reviewed on 26-06-2022
Partner with Builderscrack
Get work