Hi there, Looking for a Electrician to isntall the following. 1. Install a 2 new power points (one linked back to the lighting switch, and one cable run from the ceiling) 2. Install new downlight to bathroom (tap into existing light) 3. Install new fan extract unit 4. Swap dining room light for 3 hanging down lights instead. Tools required - Hole saw for the fan extract (150mm) - Tiling dril bit Expected duration of install - 1 day Start date: 18th Jan - 24th Jan Kind regards, Micah
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Great communication. Completed within 3 days of original request. Sent photos while away at work. S
Work carried out by the owner/operator
Reviewed on 23-01-2021
Partner with Builderscrack
Get work