The power has been cut off for our shed for the last 3 months because it wasn't being used. Because of this it was officially switched off at the mains and they told us we need a compliance check to be done before they will switch it back on
Workmanship |
5.0
|
Cost |
3.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 03-03-2020
#1 | Tradie 1 |
|
140 jobs | Secured job |
#2 | Tradie 2 |
|
161 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 6 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 5 jobs | No longer in contact |
#5 | Tradie 5 |
|
188 jobs | No longer in contact |
#6 | Tradie 6 |
|
24 jobs | No longer in contact |
Partner with Builderscrack
Get work