2 - 3 parts to the job 1 - power connection cover to our sleepout was damaged and needs repair - see photo. 2 - we have 3 outdoor lights that need fixing, I suspect the old wiring is loose as new bulbs in one didn't change a thing, can't open the others 3 - a maybe job, connecting the sleepout to our broadband via cable, might require digging. The wiring can be seen in the pic too.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator