We have a 1950's house with an internal meter board, the fuse part of the board has already been replaced with a modern board (RCD's and MCB's) however the meter needs to be moved from it's current position for some building works to be completed. Our electrical provider has agreed to provide a meter (and to do the bits that only they are allowed to do). The electrician who was orinally to do the work has put a meter box in the new position. The old meter board has a dual rate meter and ripple control both of which are no longer need as we have gas hot water.
#1 | Tradie 1 | No recent reviews | 34 jobs | No longer in contact |
#2 | Tradie 2 |
|
23 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 1 job | No longer in contact |
Partner with Builderscrack
Get work