This is from the 50's and it has reached its capacity and perhaps nearing end of its life. It has 3 phase power. I am looking for quotes to replace. It can be replaced with a couple of different boxes if makes easier/cost effective. It would be advantageous for the smart meters to be installed at the same time. We can include overnight accommodation and meals if required.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Big job done well, and as promsed.
Work carried out by the owner/operator
Reviewed on 28-08-2022
Partner with Builderscrack
Get work