I have two heated towel rails that need replacing and a timer for each, I have bought everything. I would like the cord of the new towel rails to be hidden if it is possible. It should take approximately 60mins if that.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
Sam was a great, we organised a time and he came in and did the job without any Hassel. Would definitely ask him to come back if I needed more work to be done.
Work carried out by the owner/operator
Reviewed on 01-07-2022
Partner with Builderscrack
Get work