We are in the process of designing and new kitchen and want to after pricing for electrical side. After a number of new power socket outlets where appliances will be located After wiring of new downlights in various locations. After a price to run new cables, Terminate and test. Look at two trips, One to run cables and second to liven up once everything is in place.
#1 | Tradie 1 |
|
72 jobs | No longer in contact |
#2 | Tradie 2 |
|
5 jobs | No longer in contact |
#3 | Tradie 3 |
|
69 jobs | No longer in contact |
#4 | Tradie 4 |
|
31 jobs | No longer in contact |
#5 | Tradie 5 |
|
29 jobs | No longer in contact |
Partner with Builderscrack
Get work