As demand for power increases additional electricity is needed. The job is to connect three phase cables from a transformer to a board in the shed. Distance is 200 meters and Trench is to be dug by the owner.
#1 | Tradie 1 |
|
8 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 2 jobs | No longer in contact |
#3 | Tradie 3 |
|
8 jobs | No longer in contact |
Partner with Builderscrack
Get work