3 bedroom plus en-suite have been painted. The light switches & plugs needs to be screwed into to the walls again.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 24-04-2019
Partner with Builderscrack
Get work