Two jobs. First one is wiring a bathroom extractor fan (240v 38watt) to a currently installed single switch running the light in the bathroom. Extractor fan is already mounted in the ceiling with easy access. Will require running 4-6m of 1mm TPS from light switch, or if electrical codes allow piggybacking off the light fitting (1-2m). 6m of 1mm TPS is provided. Second is replacing a cracked single power point located in the dining area. Replacement power point is provided. To be completed before --- Cheers
#1 | Tradie 1 | No recent reviews | 22 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 2 jobs | No longer in contact |
Partner with Builderscrack
Get work