Published: 22 August 2024
We need two ovens and extraction units installed/wired plus multiple power points. One for a dishwasher, one for a fridge, one for a tv, then a few just as general power points along the bench. The switch board is on the opposite wall to where the kitchen is going to be installed. There is a mezzanine floor where the wiring can run the length of the room.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Eric was very professional. He completed the job on time and as quoted, and communicated well via text and email.
Work carried out by the owner/operator
Reviewed on 30-09-2024
Partner with Builderscrack
Get work