Review

Heat pump removed, power points killed

Job image
Job image
Job image
Job image

Job description

Powerpoints
Dunedin

2 x 4 plugs made into 2 x double plugs 2 x double plugs made into 2 x 4 plugs 2 x double plugs in curtain rail killed Approximately 6 TV aerial plugs killed Removal of heat pump (for later reuse) There is also a few wires coming out of a wall which I think used to connect a TV, Sky etc which would like removed/killed.


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
4.0

Isaac did the work quickly and at very short notice, and was careful with the wall and fixtures. Thank you for the quick turnaround.

Work carried out by the owner/operator
Reviewed on 30-10-2017

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo