We need two double power points put in a wall. One on the same side as the existing one shown in the photo. One on the near side of the wall. Currently unlined. Can leave plasterboard off until needed. Would like it done as soon as possible, but can leave that section until last to allow plenty of access.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Pleasure to deal with. Gave us plenty of good advice on what to plan for with our future work too. Highly recommended
Work carried out by the owner/operator
Reviewed on 27-03-2023
Partner with Builderscrack
Get work