Hi, We have a new Heated towel rail being swapped out for a old one, and installation of a timer in the plug, (we have the timer and will hang new rail and remove old one) 8 Light switches need replacing for new ones. (we have the new light switches) 10 Electrical sockets being replaced for new ones. (we have the plug sockets) We have an old dining pendant light that we want to swap out for a new one. That should be it :-) I work from home so this afternoon or tmw would be amazing.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Fantastic service, went above and beyond, would 100% recommend.
Work carried out by the owner/operator
Reviewed on 27-08-2022
Partner with Builderscrack
Get work