Installing an additional RCD and reconfiguring the circuits at the switchboard as currently has a single RCD with 8 sub-circuits fed off it (Vynco 30-way circuit breaker board in good condition.) Replace all old VIR & rubber with new TPS cabling. At present, 4-5 circuits exit the switchboard as TPS & then join into original VIR conduit wiring. Some TRS rubber present at light switches. Have been advised that this is a two man job. I would need the work completed asap as I am about to put the house on the market. I would prefer to be given worst case fixed price quotes as my budget is tight.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Shane turned up at the arranged time & completed the job quickly & efficiently, with barely any disruption, finishing earlier than anticipated & under budget. Such a nice guy too. I will definitely use his services again. Highly recommended.
Work carried out by the owner/operator
Reviewed on 13-06-2022
Tradesperson reply
"I’m really glad you were happy with the finished job! Appreciate you using us. Cheers, Shane"
Partner with Builderscrack
Get work