1. Switchboard change in 1970's house to modern standards. New switchboard needs to be sized so some additional circuits can be fitted later (Solar/2nd HWC element etc) 2. Change lounge lighting from two different lights controlled by separate switched to two lights controlled by both switches
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
4.0
|
Oli was really good deal with, especially with myself being very specific with what I wanted done. He quoted for and completed more than I orignally asked for in the ad.
Work carried out by an employee of the company
Reviewed on 24-10-2021
Partner with Builderscrack
Get work