Review

Upgrade fuse board and repair switches

Job image
Job image
Job image
Job image
Job image
Job image

Job description

Electrical Renovations
Christchurch

We have four pieces of work we wish an electrician to complete: 1) The largest piece of work is to replace our fuse board with a modern equivalent. Previous electricians also discovered that the hot water cylinder is not connected to the main switch, which should also be fixed. 2) An old single plug outlet cover has been broken. We would like this replaced with a new outlet, preferably recessed into the wall. 3) A switch on a double plug outlet in our kitchen has jammed in the on position. We would like this fixed. 4) A switch on another double plug outlet in our kitchen has jammed in the on position. We would like this fixed. Timeframe: Completed in the month or two. We would like a rough quote before accepting an offer. Thanks, Jack


Review

Workmanship
5.0
Cost
5.0
Schedule
5.0
Communications
5.0

4Front have been great to work with from start to finish. They provided a clear quote, informed us of the process of working with our electricity provider, and worked in a professional manner. The finished work is exactly how we expected it (we are tidying the surrounding wall ourselves). Would definitely recommend.

Work carried out by an employee of the company
Reviewed on 18-03-2021

Verified Builderscrack review

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo