I am currently running ethernet cable, and want to run cable for new powerpoints at the same time. I need confirmation that the circuits I am planning to extend from can take the load, and inspection/connection once run. I already have the hardware I expect I will need.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Tercio was very knowledgeable and professional, will use him again.
Work carried out by the owner/operator
Reviewed on 21-07-2020
Partner with Builderscrack
Get work