We are getting an automated driveway gate installed and require power to be run from the house to the front of the property, which is approximately 6 or 7m away. I assume this will need to be trenched and done in conduit. I am happy to dig the required trench. We are hoping to have it completed within the next four weeks or so. Thanks
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Work carried out by the owner/operator
Reviewed on 27-03-2023
Partner with Builderscrack
Get work