We are renovating our laundry and want to put an extra power point in near to the existing point. The walls are currently open for the next week so it's a perfect time to install and run the extra wiring. The builder will be lining the room on April 1-2 so this will need to be completed this coming week. We are happy to reuse the existing power point and it will be placed under the window to the left in the photo, so your quote only needs to include one extra PDL 692 Double Vertical Socket 10A (or equivalent), which will be placed just above where the point is currently positioned in the photo and attached inside the righthand stud. Approx 60-70cm of extra wiring will also be needed.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Excellent and easy communication, great service and a job well done. Thanks Kapz!
Work carried out by the owner/operator
Reviewed on 28-03-2017
Partner with Builderscrack
Get work