I need a section of vertical framing and the full horizontal bottom piece of wood replaced, they are both rotted, the vertical piece that needs replacing as around 30 cm, the horizontal and a around 82cm
#1 | Tradie 1 |
|
112 jobs | No longer in contact |
#2 | Tradie 2 |
|
269 jobs | No longer in contact |
#3 | Tradie 3 |
|
1 job | No longer in contact |
#4 | Tradie 4 |
|
7 jobs | No longer in contact |
#5 | Tradie 5 |
|
1 job | No longer in contact |
Partner with Builderscrack
Get work