6m Sliding door track. Needs ti be installed under existing steel beam. Bottomtrack needs to be installed ..concrete floor. Within two weeks while tenant on holiday
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Gerrys work ethic and competence was impressive. Would thoroughly recommend him.
Work carried out by the owner/operator
Reviewed on 20-03-2023
Partner with Builderscrack
Get work