Break up concrete, removal is optional. Quote: A. Breaking up concrete in to manageable portions for one person to carry. B. As above, but also removed from site which is up 40 meter path. Concrete is a foundation support for brick paver edging that never happened. Area is 4 x 2.5 meters. Concrete is laid in channels dividing base-coarse up into squares. Concrete is approx 150 x 200mm with light reinforcing (1 small steel bar). Probably a quick job for somebody with right gear / kango hammer, a few hours? Base coarse in photo can stay. Want done Asap. White timber steps in photo can be lift easily out of way . Thanks
Workmanship |
4.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
4.0
|
Work carried out by an employee of the company
Reviewed on 23-05-2021
#1 | Tradie 1 |
|
17 jobs | Secured job |
#2 | Tradie 2 |
|
0 jobs | No longer in contact |
#3 | Tradie 3 |
|
92 jobs | No longer in contact |
Partner with Builderscrack
Get work