we have 3 brick pillars along the front of our property. We are looking to have 2 pillars felled and all 3 broken up into liftable chunks to be used as fill onsite. The rubble does not need to be relocated to the fill location and can be left where it lies. The pillars are approximately 1.8 m high and 2 bricks wide (square) with a concrete core and a single reinforcing rod at the base. One pillar is lying on the ground. All three are accessible to vehicles with off street parking, all have three sides exposed and are not connected to the fence. in short: 2 pillars dropped, 3 broken up.
#1 | Tradie 1 | No recent reviews | 20 jobs | No longer in contact |
#2 | Tradie 2 |
|
373 jobs | No longer in contact |
#3 | Tradie 3 |
|
106 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 67 jobs | No longer in contact |
Partner with Builderscrack
Get work