Published on 4 September 2016
I need approx 60m by 3m /50% 2 strips and rest solid concrete taken out and removed/disposed. I can have concrete cut where needed if required and would like some dirt taken out to ease the slope in one part as well as dig down a little so we can have another drive relaid at 150 thick for sub divided sections driveway. We want to retain some of the newer cement along one side and need a trench dug for new services (power/ water/gas/fibre) right to the end if possible. Truck access via end of driveway and fairly flat. Wanting this done start october 2016 if poss, quote wanted cheers
Partner with Builderscrack
Get work