About half a skip's worth of demolishion wood to be removed. Needs a weedwhack (160sqm) a skip or truck brought to site then bits of wood and lining removed from building to be loaded and taken away. No asbestos or anything that resembles it.
#1 | Tradie 1 |
|
21 jobs | No longer in contact |
Partner with Builderscrack
Get work