Published: 29 March 2017
We need to have floor tiles that have been uplifted to be removed from the site. This will involve getting a hardfill skip and wheel barrowing the tiles to the skip (15-30m distance). There is also some general demo waste (gib, tiles, timber, building materials) that also need to be removed.
#1 | Tradie 1 | No recent reviews | 78 jobs | No longer in contact |
#2 | Tradie 2 | No recent reviews | 7 jobs | No longer in contact |
#3 | Tradie 3 | No recent reviews | 3 jobs | No longer in contact |
#4 | Tradie 4 | No recent reviews | 0 jobs | No longer in contact |
#5 | Tradie 5 | No recent reviews | 0 jobs | No longer in contact |
Partner with Builderscrack
Get work