Clearing rubble (old tiles, pipes and wood cuts etc) from under the house so a moisture barrier can be put down. The man hole is not large and will mostly involve crawling. Remove the rubble from the house including a 1 square metre (approx) of rubble already removed from the subfloor. 100 square metre house. The sooner the better, but by the 5th of April.
#1 | Tradie 1 | No recent reviews | 7 jobs | No longer in contact |
Partner with Builderscrack
Get work