I need to rip up the existing laminated timber flooring, remove the gib to the second nog (appproximately 800mm) from the ground and remove the existing insulation to this level.
#1 | Tradie 1 |
|
5 jobs | No longer in contact |
#2 | Tradie 2 |
|
33 jobs | No longer in contact |
#3 | Tradie 3 |
|
41 jobs | No longer in contact |
#4 | Tradie 4 |
|
9 jobs | No longer in contact |
#5 | Tradie 5 |
|
16 jobs | No longer in contact |
#6 | Tradie 6 |
|
105 jobs | No longer in contact |
#7 | Tradie 7 |
|
2 jobs | No longer in contact |
#8 | Tradie 8 |
|
221 jobs | No longer in contact |
Partner with Builderscrack
Get work