Tiles uplifted. Gib left in place. All other fittings removed. All services will be isolated before start. 2 toilets. 2 showers. 1 bath.
Workmanship |
5.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Very quick response. The two of them can decide and just got on with the job.
Work carried out by the owner/operator
Reviewed on 19-01-2023
Partner with Builderscrack
Get work