Scaffolder to erect scaffolding for a residential build. Total lineal metres approx 30 split between 2 elevations. House is single level at the front and two at the rear so working platform for upper level required part way along each elevation. Safety rail for roof also required.
#1 | Tradie 1 | No recent reviews | 1 job | No longer in contact |
#2 | Tradie 2 | No recent reviews | 1 job | No longer in contact |
#3 | Tradie 3 | No recent reviews | 49 jobs | No longer in contact |
Partner with Builderscrack
Get work