I need to remove the top 2cm of concrete from an old concrete pad (approx 1m x 2m) in my laundry area, to make it level with the wooden flooring in the rest of the room. The purpose is to get it ready for tiling, so the reduced concrete level would need to be screeded off at floor height.
Workmanship |
4.0
|
Cost |
5.0
|
Schedule |
5.0
|
Communications |
5.0
|
Craig was very easy to communicate with, responded promptly to my job request and followed up with job completion very quickly. I am happy with the job done.
Work carried out by the owner/operator
Reviewed on 01-03-2017
Partner with Builderscrack
Get work