Published: 30 October 2022
About 1 -1.5 sqm of concrete needs to be cut &/or scabbled off to form a better access ramp to a car-pad.
Workmanship |
5.0
|
Cost |
4.0
|
Schedule |
5.0
|
Communications |
5.0
|
All good. Thanks James
Work carried out by the owner/operator
Reviewed on 09-12-2022
Partner with Builderscrack
Get work