Remove existing path pavers and lay concrete path. Remove old brick flower bed and concrete to merge with footpath. May require drainage at bottom of stairs as property on slight lean and could connect to down pipe on house other side of lemon tree.
#1 | Tradie 1 |
|
33 jobs | No longer in contact |
#2 | Tradie 2 |
|
67 jobs | No longer in contact |
Partner with Builderscrack
Get work