Active job

Cut the concrete in the factory channels and a tank

Job description

Concrete Cutting & Drilling
Waitakere

Cut two water channels on the concrete floor, 13.7m and 8.77m long, both around 120mm wide and 150mm deep. Please see the blue indicative lines on the drawing. Also need a settling tank, 3000mm*450mm*450mm


Trade professionals

#1 Tradie 1
121 jobs No longer in contact
#2 Tradie 2
19 jobs No longer in contact
#3 Tradie 3
18 jobs No longer in contact
#4 Tradie 4
11 jobs No longer in contact
#5 Tradie 5
8 jobs No longer in contact
#6 Tradie 6
13 jobs No longer in contact

Get connected now with NZ’s largest trade professional network

Get started

As seen on

logo
logo
logo
logo
logo
logo
logo
logo