Need the drain in front of garage increased from 100 mm to 300 mm which means a concrete cut across the width of the garage and preferably bit deeper than the existing.Also require metal grill across this.
#1 | Tradie 1 |
|
57 jobs | No longer in contact |
#2 | Tradie 2 |
|
121 jobs | No longer in contact |
#3 | Tradie 3 |
|
18 jobs | No longer in contact |
Partner with Builderscrack
Get work